New Arrivals/Restock

KOMFOTT Twin Size Metal Bed Frame with Headboard & Footboard, Victorian Style Metal Platform Bed Frame with Under Bed Storage, Noise-Free Mattress Foundation No Box Spring Needed, Black

flash sale iconLimited Time Sale
Until the end
00
16
59

US$41.99 cheaper than the new price!!

Free shipping for purchases over $99 ( Details )
Free cash-on-delivery fees for purchases over $99
Please note that the sales price and tax displayed may differ between online and in-store. Also, the product may be out of stock in-store.
Used  US$28.00
quantity

Product details

Management number 209782878 Release Date 2026/03/29 List Price US$28.00 Model Number 209782878
Category

Description :Transform your space with our Victorian style metal platform bed - where timeless elegance meets modern durability. Featuring a stunningly crafted headboard and footboard with safety-first rounded corners, this bed frame is not just a piece of furniture, but a statement of style. Supporting up to an impressively weight, thanks to its ultra-strong frame and legs, with added non-slip foot pads for unbeatable stability. Sleep soundly on our noise-canceling, easy-to-assemble slat system, and enjoy the extra storage below - 12.5 inches of space to declutter and organize! Best part? No box spring needed and perfect for any standard mattress! Bring home the charm and sophistication of Victorian craftsmanship mixed with contemporary finesse. Elevate your bedroom instantly!Feature :Classic Victorian style decoration will bring a touch of vintage elegance12 robust metal slats with reinforced connection offers reliable supportHeavy-duty metal construction with support legs for longevity12.5" under bed storage space for suitcases, shoes and storage boxesNoise-free design ensures a restful night sleepEasy-to-assemble slats save you time and effortNo sliding mattress with anti-skid design of the bedNon-slip foot pads prevents unsightly scratchesSpecification:Color: BlackMaterial: MetalOverall Dimensions: 78" x 40" x 42" (L x W x H)Dimensions of Bed Platform: 75" x 39" (L x W)Clearance Between Bed and Ground: 12.5"Footboard Height: 26"Recommended Mattress: 8"-12" TwinWeight Capacity: 660 lbsNet Weight: 37.5 lbs1 x Metal Bed Frame1 x User Manual

  • Victorian Elegance: This metal platform bed boasts a Victorian style headboard and footboard, infusing your bedroom with a sense of classic elegance and timeless charm. Plus, the rounded corners enhance the style while preventing bumping accidents.
  • Sturdy Built, Extra Support: The twin bed features a heavy-duty metal frame that is supported by 6 legs. It provides robust support and the ability to hold up to 660 lbs, coupled with non-slip foot pads for enhanced stability.
  • 12-Slat Platform: The bed comes with a 12-slat support system that is designed with a snap-lock structure for quick and easy assembly.
  • Ample Under Bed Storage: Enjoy 12.5" of under bed storage space, perfect for keeping extra bedding, shoes, or other items neatly tucked away and out of sight. What's more, the clearance makes it easy for you to sweeping the floor.
  • No Box Spring Needed: The mattress foundation is thoughtfully designed with an anti-skid feature to prevent the mattress from easy sliding. It is compatible with 8"-10" standard sized mattress, no box spring needed.
Size Twin
Color Black
Shape Rectangular
Brand Name KOMFOTT
Item Weight 37.5 Pounds
Finish Types Powder Coated
Manufacturer KOMFOTT
Model Number 10840-HU-KT
Material Type Metal
Item Type Name Twin Size Metal Bed Frame
Item Dimensions 78 x 40 x 42 inches
Required Assembly Yes
Included Components 1 x Metal Bed Frame
Manufacturer Part Number 10840-HU-KT
Item Dimensions L x W x H 78"L x 40"W x 42"H
Maximum Weight Recommendation 660 Pounds
Other Special Features of the Product No Box Spring Needed

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Product Review

You must be logged in to post a review